SOFTFLIX
Train Simulator: North London Line Route Add-On – 커버

Train Simulator: North London Line Route Add-On

  • Steam
  • Simulator

주요 정보

  • 플랫폼Steam
  • 제품디지털 키
  • 출시일2015년 10월 22일
  • 장르Simulator
  • 개발자Dovetail Games
  • 퍼블리셔Dovetail
  • 언어3

활성화 방법

  1. Steam을(를) 설치하고 계정에 로그인하세요(무료 계정이면 충분합니다).
  2. 상단 메뉴에서 „게임” → „Steam에서 제품 활성화…”를 선택하세요.
  3. 주문에 표시된 그대로(하이픈 포함) 키를 입력하고 확인하세요. 게임이 라이브러리에 추가됩니다.

Steam 공식 활성화 안내

게임 정보

One of the busiest commuter routes through the UK’s capital city is stunningly recreated for Train Simulator in this new route add-on.

The North London Line spans approximately 17 miles between Richmond and Stratford, and is today part of the London Overground network. The line is a heavy commuter route with trains every 15 minutes, and also a key corridor for freight traffic, connecting the inner suburbs north of London. Despite the line’s short length, the route is almost entirely dense inter-urban railway, with trains taking more than one hour to traverse the route when calling at all 23 stations.

Built over a total of 25 years in five connecting sections, the first portion of the line was opened as the Eastern Counties and Thames Junction Railway in 1846 between Stratford and North Woolwich, with the last portion opening in 1869 between South Acton and Richmond by the London & South Western Railway.

The 1980s started to see closures across the line, the most notable being the closure of Broad Street station, a once major terminus for the City of London that became a dwindling station with very few passengers. Other notable closures on the line included the Tottenham Hale to Stratford link, and more recently the section between Stratford and North Woolwich in 2006. Where that track once stood is now used by the Docklands Light Railway and will also become part of the Crossrail branch to Abbey Wood in 2018.

The line is electrified mostly with 25kV AC overhead catenary between Stratford and Acton Central, made so that dual voltage Class 313s could use the line and also open it up to electric freight locomotives. The section between Acton Central and Richmond sees third rail power, and between Gunnersbury and Richmond there is also a fourth rail as the London Overground and District Line shares this stretch of the network.

Today the line is populated by Class 378/2 ‘Capitalstars’ forming the London Overground services, D78 Tube Stock for District Line services between Richmond and Gunnersbury, and Class 66s, 70s, 90s and 92s hauling freight.

The North London Line for Train Simulator recreates the 17 mile route as it operates today between Richmond in the South West of London and Stratford in the North East, with the track curving in a rough semicircle shape to avoid the centre of London. The route includes standard British LED signalling throughout and the modern TfL Class 378 ‘Capitalstar’.

Scenarios

Seven scenarios for the route:

  • Coming From Clapham
  • Quattro Service
  • Late for Work!
  • Stratford Slurry: Part 1
  • Stratford Slurry: Part 2
  • Early Morning Run
  • Camden Showers

시스템 요구 사항

최저한의
운영체제
Windows® 7 / 8.1
프로세서
Processor: 2.8 GHz Core 2 Duo (3.2 GHz Core 2 Duo recommended), AMD Athlon MP (multiprocessor variant or comparable processors)
메모리
4 GB RAM
그래픽
512 MB - 1GB with Pixel Shader 3.0 (AGP PCIe only)
DirectX
9.0c
저장공간
40 GB HD space
사운드카드
Direct X 9.0c compatible
추천